VDM Energija d.o.o. – Donji Miholjac

U ruralnom području izgradnja elektrane na bioplin prikladan je sustav za zatvaranje poljoprivrednog procesa proizvodnje i prerade.

Bioplinsko postrojenje za proizvodnju električne energije snage 1 MWh u gradu Donji Miholjac u Osječko-baranjskoj županiji.

Činjenice

The 1 MWh biogas power plant is located in the municipality of Donji Miholjac in Osijek-Baranja County. In a rural area such as the village of Doni Miholjac, the construction of a biogas power plant is an appropriate system for the closure of the production and processing agricultural process, as it enables heat and electricity to be obtained as well as for the provision of excellent fertilizer represented by the processed kosopstrat. The construction of a biogas power plant began in July 2016 with the help of bank loan financing. The 2-3 month trial with obtaining the Operating License took place in mid-2018, and the full operation began at the end of 2018.

O postrojenju

Impresum

Adresa sjedišta: Gregurovec 23, 48260 Križevci
Lokacija: Industrijska zona bb, Donji Miholjac
MBS: 010073895
OIB: 37045165848
IBAN: HR 4723400091110774901
E-pošta: info@bioen.eco
Telefon: +385 48 850 134

Kontaktirajte nas